FACTS AND FIGURES

Cut and Cover Tunnel
West Bank
East Bank

95 metres long
260 metres long
Immersed Tube Tunnel
Section Width
Section Height
Section Weight
Section Length

23.9 metres
9.15 metres
approx. 30,000 tonnes each
2 sections at 126 metres
1 section at 118 metres
Total Tunnel Length
725 metres between portals
Total Scheme Length
1.5 km between Pembroke Road in Chatham Maritime and Anthony's Way in Frindsbury

Total Scheme Cost
£80,000,000
Construction Began
July 1992
Tunnel Opened

12 June 1996

 

 

Each section of the tunnel weighs 30,000 tonnes - over six times the weight of the Royal Navy frigate HMS Chatham.

 
 

The tunnel needed 100,000 cubic metres of concrete weighing 250,000 tonnes and requiring 20,000 truck loads to deliver.

 
 

The 1,500 miles of steel bars used to reinforce the concrete, if laid end to end, would stretch from Chatham to Moscow.