Cut and Cover Tunnel
West Bank
East Bank |
95 metres long
260 metres long
|
Immersed Tube Tunnel
Section Width
Section Height
Section Weight
Section Length
|
23.9 metres
9.15 metres
approx. 30,000 tonnes each
2 sections at 126 metres
1 section at 118 metres
|
Total Tunnel Length |
725 metres between portals |
Total Scheme Length |
1.5 km between Pembroke Road in Chatham Maritime and Anthony's Way in Frindsbury
|
Total Scheme Cost |
£80,000,000 |
| Construction Began |
July 1992 |
Tunnel Opened
|
12 June 1996
|
| |
Each
section of the tunnel weighs 30,000 tonnes - over six times
the weight of the Royal Navy frigate HMS Chatham. |
|
| |
The
tunnel needed 100,000 cubic metres of concrete weighing
250,000 tonnes and requiring 20,000 truck loads to deliver.
|
|
| |
The
1,500 miles of steel bars used to reinforce the concrete,
if laid end to end, would stretch from Chatham to Moscow.
|
|
|
|
|